Title: Scheduling optimization of prefabricated construction projects by genetic algorithm
Author: Xie, L.
Chen, Y.
Chang, R.
Citation: Applied Sciences, 2021; 11(12):1-21
Publisher: MDPI AG
Issue Date: 2021
ISSN: 2076-3417
2076-3417
Statement of
Responsibility: 
Linlin Xie, Yajiao Chen and Ruidong Chang
Abstract: Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assembly construction. It cannot also fully adapt to the scheduling implementation method of the prefabricated construction projects. It is difficult to work out a reasonable project schedule and resource allocation table. In order to determine the relevant schedule parameters that can reflect the actual construction situation of the prefabricated building and meet the scheduling requirements of the prefabricated project, this study proposes a prefabricated construction project scheduling model that considers project resource constraints and prefabricated component supply constraints. Additionally, it improves the design of traditional genetic algorithms (GAs). Research results of the experimental calculation and engineering application show that the proposed project scheduling optimization model and GA are effective and practical, which can help project managers in effectively formulating prefabricated construction project scheduling plans, reasonably allocating resources, reducing completion time, and improving project performance.
Keywords: prefabricated construction; project scheduling optimization; genetic algorithm; resource constrained; prefabricated component supply
Description: Published: 15 June 2021
Rights: Copyright: © 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https:// creativecommons.org/licenses/by/ 4.0/).
DOI: 10.3390/app11125531
Published version: http://dx.doi.org/10.3390/app11125531
Appears in Collections:Architecture publications
Aurora harvest 4

Files in This Item:
File Description SizeFormat 
hdl_131124.pdfPublished version902.14 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.